T3 history on the TRAM
Each day, how punctual the T3 was and the disruptions that affected it. Tap a day to see the details.
Latest day: Wednesday, 28 October 2026
Every morning, around 10:30, the previous day is added, once even the most delayed journeys have finished.
The last 7 days
22 October to 28 October · compared with the 7 days before
5 without real-time data
- On time
- 93%
- +6.8 points
- Average delay
- 1.8 mins
- −0.8 mins
- Cancelled
- 0%
- −0.1 points
- Scheduled journeys
- 1,063
- 7 days
Share of journeys that arrived less than 5 min late, each day.
- 9022T
- 8823F
- 9924S
- 9625S
- 9926M
- 8727T
- 9028W
Over the last 7 days, 93% of journeys on the T3 arrived less than 5 minutes late. The average delay was 1.8 mins, and 0% of journeys were cancelled.
TRAM real-time data, stored and measured daily by Transporta’mHow it is measured
Each day’s punctuality < 40 % 40–70 % 70–90 % ≥ 90 % Partial data No data