T5 history on the TRAM
How punctual the T5 was over the last days, compared with the ones before. The day-by-day calendar and how it is doing today are in the app.
Latest day: Monday, 23 November 2026
Every morning, around 10:30, the previous day is added, once even the most delayed journeys have finished.
The last 30 days
25 October to 23 November · compared with the 30 days before
9 journeys cancelled · 116 without real-time data
- On time
- 99%
- +0.8 points
- Average delay
- 0.9 mins
- −0.2 mins
- Cancelled
- 0.1%
- −0.4 points
- Scheduled journeys
- 10,258
- 30 days
Over the last 30 days, 99% of journeys on the T5 arrived less than 5 minutes late. The average delay was 0.9 mins, and 0.1% of journeys were cancelled.
TRAM real-time data, stored and measured daily by Transporta’mHow it is measured