T6 history on the TRAM

How punctual the T6 was over the last days, compared with the ones before. The day-by-day calendar and how it is doing today are in the app.

Latest day: Monday, 23 November 2026

Every morning, around 10:30, the previous day is added, once even the most delayed journeys have finished.

How the T6 is doing today: in the app

The last 30 days

25 October to 23 November · compared with the 30 days before

17 without real-time data

On time
100%
+0.8 points
Average delay
0.4 mins
−0.2 mins
Cancelled
0%
−0.4 points
Scheduled journeys
2,277
30 days

Over the last 30 days, 100% of journeys on the T6 arrived less than 5 minutes late. The average delay was 0.4 mins, and 0% of journeys were cancelled.

TRAM real-time data, stored and measured daily by Transporta’mHow it is measured

The line’s punctuality, in the app

The whole year’s calendar, the week-by-week trend and how today is going, hour by hour.

Download it for free:

Download Transporta’m on Google PlayDownload Transporta’m on the App Store