Thursday, 12 November 2026
82 disruptions affected service that day.
Rodalies de Catalunya
12% on time88% of journeys on Rodalies de Catalunya arrived 5 or more minutes late, with an average delay of 36.8 mins. 61 journeys were cancelled, 7%.
Scheduled service: 942 journeys
- Ran: 670
- Cancelled: 61
- No data: 211
Nothing was heard from 211 journeys: they may have run without reporting or been cancelled without notice, so cancellations may be higher.
| Line | On time | Average delay | Cancelled | |
|---|---|---|---|---|
| R1 | Molins de Rei - Maçanet-MassanesAverage delay: 66 minsCancelled: 5% | 4% | 66 mins | 5% |
| R2N | Aeroport - Maçanet-MassanesAverage delay: 29.5 minsCancelled: 1% | 3% | 29.5 mins | 1% |
| R2S | Estació de França - St VicençAverage delay: 36 minsCancelled: 6% | 2% | 36 mins | 6% |
| R3 | L’Hospitalet de Llobregat - PuigcerdàAverage delay: 16 minsCancelled: 0% | 23% | 16 mins | 0% |
| R4 | St Vicenç - ManresaAverage delay: 50.2 minsCancelled: 5% | 4% | 50.2 mins | 5% |
| R7 | Fabra i Puig - Cerdanyola UniversitatAverage delay: 9.1 minsCancelled: 17% | 39% | 9.1 mins | 17% |
| R8 | Martorell - Granollers CentreAverage delay: 9.3 minsCancelled: 3% | 40% | 9.3 mins | 3% |
| R11 | Barcelona Sants - PortbouAverage delay: 28.5 minsCancelled: 2% | 9% | 28.5 mins | 2% |
| R15 | Estació de França - Riba-roja d’EbreAverage delay: 31.8 minsCancelled: 0% | 3% | 31.8 mins | 0% |
| R16 | Estació de França - TortosaAverage delay: 28.8 minsCancelled: 0% | 23% | 28.8 mins | 0% |
| RT2 | Tarragona - Salou - Port AventuraAverage delay: 0.8 minsCancelled: 0% | 100% | 0.8 mins | 0% |
| RL3 | Lleida Pirineus - CerveraAverage delay: 11.6 minsCancelled: 0% | 33% | 11.6 mins | 0% |
| RL4 | Lleida Pirineus - Terrassa NordAverage delay: 21.8 minsCancelled: 0% | 0% | 21.8 mins | 0% |
Disruptions6
Due to a technical incident involving a train at Barcelona-Sants, now resolved, trains are running outside their usual timetable.
Significant delays· Major disruption
Due to an infrastructure incident between El Clot and Sant Adrià de Besòs, and another between Mataró and Arenys, trains may stop as they approach the affected sections and their journey times may increase.
Reduced service· Major disruption
Train service between La Garriga and Puigcerdà/La Tor de Querol. Alternative road service between Fabra i Puig and La Garriga. Supplementary road service between La Garriga and Puigcerdà/La Tor de Querol.
Train service between Lleida Pirineus and Les Borges Blanques, and between La Plana Picamoixons and Barcelona Estació de França. Alternative road service between Lleida Pirineus and La Plana Picamoixons.
Due to rolling stock failures caused by the rain and operating disruptions resulting from yesterday's strike, delays may occur on the Rodalies de Catalunya service. A road reinforcement service has been set up at various points on the network.
Degut als problemes de mobilitat a les carreteres per la vaga general, el personal de conducció no pot arribar a les estacions i no s’estan complint els serveis mínims programats. Recomanem buscar mitjans alternatius de transport.
Service was suspended for part of the day.
Disruptions1
Service disruption· Critical disruption
Line L4 is stopped due to technical causes.
FGC
99% on time99% of journeys on FGC arrived less than 5 minutes late, with an average delay of 1 min.
Scheduled service: 1,568 journeys
- Ran: 1,563
- No data: 5
Nothing was heard from 5 journeys: they may have run without reporting or been cancelled without notice, so cancellations may be higher.
| Line | On time | Average delay | Cancelled | |
|---|---|---|---|---|
| S1 | Pl. Catalunya - TerrassaAverage delay: 1.2 minsCancelled: 0% | 98% | 1.2 mins | 0% |
| S2 | Pl. Catalunya - SabadellAverage delay: 1 minCancelled: 0% | 99% | 1 min | 0% |
| S3 | Pl. Espanya - Can RosAverage delay: 1.3 minsCancelled: 0% | 98% | 1.3 mins | 0% |
| S4 | Pl. Espanya - Olesa de MontserratAverage delay: 1.4 minsCancelled: 0% | 98% | 1.4 mins | 0% |
| S8 | Pl. Espanya - Martorell EnllaçAverage delay: 1.3 minsCancelled: 0% | 98% | 1.3 mins | 0% |
| L6 | Pl. Catalunya - SarriàAverage delay: 0.9 minsCancelled: 0% | 99% | 0.9 mins | 0% |
| L7 | Pl. Catalunya - Av. TibidaboAverage delay: 1 minCancelled: 0% | 100% | 1 min | 0% |
| L8 | Pl. Espanya - Molí NouAverage delay: 1 minCancelled: 0% | 99% | 1 min | 0% |
| L12 | Sarrià - Reina ElisendaAverage delay: 0.1 minsCancelled: 0% | 100% | 0.1 mins | 0% |
| R5 | Pl. Espanya - Manresa BaixadorAverage delay: 1.7 minsCancelled: 0% | 98% | 1.7 mins | 0% |
| R6 | Pl. Espanya - IgualadaAverage delay: 1.5 minsCancelled: 0% | 97% | 1.5 mins | 0% |
Disruptions2
At 9:30, the minimum services established by the Government of Catalonia's Department of Business and Labour will end. Between 9:30 and 16:30, there will be no train service and all stations will remain closed. Train service will resume at 16:30 with the scheduled minimum services.
Minimum services for the strike day of November 11.
TRAM
83% on timeService was suspended for part of the day. 83% of journeys on the TRAM arrived less than 5 minutes late, with an average delay of 3 mins. 3 journeys were cancelled, 0.2%.
Scheduled service: 1,209 journeys
- Ran: 1,161
- Cancelled: 3
- No data: 45
Nothing was heard from 45 journeys: they may have run without reporting or been cancelled without notice, so cancellations may be higher.
| Line | On time | Average delay | Cancelled | |
|---|---|---|---|---|
| T1 | Francesc Macià - Bon ViatgeAverage delay: 6 minsCancelled: 0% | 64% | 6 mins | 0% |
| T2 | Francesc Macià - Llevant-Les PlanesAverage delay: 5.4 minsCancelled: 0% | 65% | 5.4 mins | 0% |
| T3 | Francesc Macià - Sant FeliuAverage delay: 6 minsCancelled: 0% | 59% | 6 mins | 0% |
| T4 | Verdaguer - Sant AdriàAverage delay: 2.4 minsCancelled: 1% | 87% | 2.4 mins | 1% |
| T5 | Ciutadella - GorgAverage delay: 0.7 minsCancelled: 0% | 100% | 0.7 mins | 0% |
| T6 | Ciutadella - Sant AdriàAverage delay: 0.7 minsCancelled: 0% | 100% | 0.7 mins | 0% |
Disruptions6
Service disruption· Critical disruption
Due to a breakdown, no service between the Verdaguer and Glòries stops on line T4.
Service disruption· Critical disruption
Due to an accident, no service between the Glòries and El Maresme stops.
Due to the weather, the frequencies are altered in lines T4, T5 and T6.
Due to a breakdown, frequencies are altered on lines T1, T2 and T3.
Significant delays· Major disruption
Due to a breakdown, the frequencies are altered on line T5.
During the general strike on November 11, TRAM will provide the minimum services established by the Department of Business and Labour of the Government of Catalonia, corresponding to 25% of the regular service between 6:30 a.m. and 9:30 a.m., and between 4:30 p.m. and 9:00 p.m. Outside these time periods, no minimum services have been established, so tram operations may vary throughout the day depending on participation in the strike.
Valencia Cercanías
73% on time28% of journeys on Valencia Cercanías arrived 5 or more minutes late, with an average delay of 4.8 mins. 5 journeys were cancelled, 2%.
Scheduled service: 266 journeys
- Ran: 255
- Cancelled: 5
- No data: 6
Nothing was heard from 6 journeys: they may have run without reporting or been cancelled without notice, so cancellations may be higher.
| Line | On time | Average delay | Cancelled | |
|---|---|---|---|---|
| C1 | València Nord - GandiaAverage delay: 4.7 minsCancelled: 3% | 73% | 4.7 mins | 3% |
| C2 | València Nord - MoixentAverage delay: 3.6 minsCancelled: 4% | 78% | 3.6 mins | 4% |
| C3 | València Nord - UtielAverage delay: 2.1 minsCancelled: 0% | 90% | 2.1 mins | 0% |
| C6 | València Nord - CastellóAverage delay: 8.9 minsCancelled: 0% | 49% | 8.9 mins | 0% |
Disruptions41
Significant delays· Major disruption
Line C6. Due to an infrastructure failure at Borriana, delays may occur in both directions of travel. Technicians are working to resolve it. We will keep you informed.
Delay· Minor disruption
Line C2. Train scheduled to leave València Nord station at 21:20 for l'Alcúdia is running via Benifaió, 17 minutes late.
Delay· Minor disruption
Line C6. Train scheduled to depart at 19:35 from Castelló station to València Nord is running via Massalfassar with a 21-minute delay.
Delay· Minor disruption
Line C6. Train scheduled to depart at 19:30 from Castelló station to València Nord, is running via Puçol with a 16-minute delay.
Delay· Minor disruption
Line C6. Train scheduled to depart at 19:05h from Castelló station to València Nord, departs 28 minutes late.
Delay· Minor disruption
Line C6. Train scheduled to depart at 18:35 from Castelló station to València Nord, is running via Sagunto with a 16-minute delay.
Delay· Minor disruption
Line C1. Train scheduled to depart at 18:51h from València Nord station to Gandia is running via Silla with a 16-minute delay.
Delay· Minor disruption
Line C6. Train scheduled to depart from València Nord station at 18:55 bound for Castelló is departing 17 minutes late.
Delay· Minor disruption
Line C2. Train scheduled to depart from València Nord station at 17:50h bound for l'Alcúdia, is running through Algemesí 35 minutes late.
Delay· Minor disruption
Line C2. Train scheduled to depart at 18:30 from València Nord station to Xàtiva is running through Catarroja with an 18-minute delay.
Delay· Minor disruption
Line C6. Train scheduled to depart at 18:20h from València Nord station, bound for Castelló, is running via València Font de Sant Lluís with a delay of 26 minutes.
Delay· Minor disruption
Line C6. Train scheduled to depart at 18:05 from Castelló station to València Nord is running via Burriana, 27 minutes late.
Delay· Minor disruption
Line C2. Train scheduled to depart at 17:50h from València Nord station, bound for l'Alcúdia, is departing 20 minutes late.
Delay· Minor disruption
Line C1. Train scheduled to depart at 17:45h from València Nord station, bound for Gandia, is departing 15 minutes late.
Delay· Minor disruption
Line C1. Train scheduled to depart Gandia station at 17:13h for València Nord is running through Tavernes with a 15-minute delay.
Delay· Minor disruption
Line C2. Train scheduled to depart at 16:30 from Xàtiva station to València Nord, is running via Silla with a 19-minute delay.
Delay· Minor disruption
Line C1. Train scheduled to leave Gandia station at 16:43 for València Nord is running through Xeraco with a 16-minute delay.
Delay· Minor disruption
Line C1. Train scheduled to depart from València Nord station at 15:45h for Gandia departs 21 minutes late.
Delay· Minor disruption
Line C1. Train scheduled to depart from Gandia station at 15:49 for València Nord is departing 16 minutes late.
Delay· Minor disruption
Line C1. Train scheduled to depart from València Nord station at 15:30h, bound for Gandia, is running through Silla 15 minutes late.
Delay· Minor disruption
Line C2. Train scheduled to depart at 15:15 from València Nord station, bound for Xàtiva, is running via Benifaió 19 minutes late.
Delay· Minor disruption
Line C6. Train scheduled to depart at 15:05h from Castelló station towards València Nord is running via Almenara, 15 minutes late.
Delay· Minor disruption
Line C6. Train scheduled to depart from València Nord station at 14:45 for Castelló is departing 15 minutes late.
Delay· Minor disruption
Line C2. Train scheduled to depart from València Nord station at 15:00 for Xàtiva is departing 18 minutes late.
Delay· Minor disruption
Line C2. Train due to depart from L'Alcúdia station at 14:25h towards València Nord is resuming its journey with a 15-minute delay.
Delay· Minor disruption
Line C2. Train scheduled to depart at 12:30h from València Nord station to l'Alcúdia, running via Benifaió with a 16-minute delay. Operational incident.
Delay· Minor disruption
Line C6. Train scheduled to leave Castelló station at 10:35 for València Nord is running via Massalfassar 20 minutes late. Infrastructure failure at Borriana.
Delay· Minor disruption
Line C6. Train scheduled to depart at 10:00 from Castelló station to València Nord is running via Burriana with a 25-minute delay. Infrastructure failure at Burriana.
Delay· Minor disruption
Line C6. Train scheduled to depart at 08:50h from València Nord station, bound for Castelló, is running via Burriana with a 42-minute delay. Infrastructure fault in Burriana.
Delay· Minor disruption
Line C6. Train scheduled to depart at 09:00 from Castelló station to València Nord is running via Moncofa, 33 minutes late. Infrastructure fault at Borriana.
Delay· Minor disruption
Line C1. Train scheduled to leave València Nord station at 08:21h bound for Gandia is departing 21 minutes late. Operational incident.
Delay· Minor disruption
Line C2. Train scheduled to leave Xàtiva station at 08:30h for València Nord departs 16 minutes late. Operational incident.
Delay· Minor disruption
Line C6. Train scheduled to depart at 07:50 from Castelló station to València Nord is running 15 minutes late via Massalfassar. Infrastructure fault at Borriana.
Delay· Minor disruption
Line C6. Train scheduled to depart from Castelló station at 07:20h for València Nord is running via La Llosa with a 15-minute delay. Infrastructure failure in Borriana.
Delay· Minor disruption
Line C6. Train scheduled to depart at 07:20h from València Nord station to Castelló is departing 23 minutes late. Infrastructure fault in Borriana.
Delay· Minor disruption
Line C2. Train scheduled to depart from València Nord station at 06:50 to Xàtiva is departing 19 minutes late. Operational incident.
Delay· Minor disruption
Line C6. Train scheduled to depart at 07:10 from Castelló station towards València Nord, is running via Almassora 21 minutes late. Infrastructure failure in Burriana.
Delay· Minor disruption
Line C6. Train scheduled to depart at 06:20 from Castelló station to València Nord is departing 24 minutes late. Operational incident.
Delay· Minor disruption
Line C2. Train scheduled to depart at 06:10h from València Nord station, bound for l'Alcúdia, is running via Silla 16 minutes late. Operational incident.
Attention: The partial strikes planned by the SEMAF train drivers' union for today, 12 November 2026, have been called off. Train service is running according to the usual timetable.
Due to the general strike called for today, 11 November, service could be affected. Thank you for your understanding.
Murcia/Alicante Cercanías
36% on time64% of journeys on Murcia/Alicante Cercanías arrived 5 or more minutes late, with an average delay of 11.4 mins. 1 journey was cancelled, 2%.
Scheduled service: 58 journeys
- Ran: 56
- Cancelled: 1
- No data: 1
Nothing was heard from 1 journey: it may have run without reporting or been cancelled without notice, so cancellations may be higher.
| Line | On time | Average delay | Cancelled | |
|---|---|---|---|---|
| C1 | Alacant - MurciaAverage delay: 16.4 minsCancelled: 0% | 9% | 16.4 mins | 0% |
| C3 | Alacant - St VicentAverage delay: 3.1 minsCancelled: 5% | 81% | 3.1 mins | 5% |
Disruptions26
Delay· Minor disruption
Line C1. Train scheduled to depart from Alacant Terminal station at 20:50 towards Murcia del Carmen is leaving 15 minutes late. Operational incident.
Delay· Minor disruption
Line C3. Train scheduled to depart from Alacant Terminal station at 20:48 bound for Sant Vicent Centre is departing 15 minutes late. Operational incident.
Delay· Minor disruption
Line C1. Train scheduled to depart at 19:10 from Alacant Terminal station to Murcia del Carmen is running through El Reguerón with a 15-minute delay. Railway traffic management.
Delay· Minor disruption
Line C1. Train scheduled to leave Callosa de Segura station at 18:50h for Alacant Terminal is leaving 15 minutes late. Railway traffic management.
Delay· Minor disruption
Line C1. Train scheduled to depart at 17:30h from Murcia del Carmen station bound for Alacant Terminal, is running via Crevillente 32 minutes late. Railway traffic management.
Delay· Minor disruption
Line C1. Train scheduled to depart at 17:30 from Alacant Terminal station to Murcia del Carmen is departing 16 minutes late. Railway traffic.
Delay· Minor disruption
Line C1. Train scheduled to depart from Alacant Terminal station at 19:10h for Murcia del Carmen is departing 21 minutes late. Operational incident.
Delay· Minor disruption
Line C1. Train scheduled to depart at 16:40 from Alacant Terminal station bound for Callosa de Segura is running via Torrellano 16 minutes late. Operational incident.
Delay· Minor disruption
Line C3. Train scheduled to depart at 16:28h from Sant Vicent Centre station to Alacant Terminal, departs from its origin with an approximate delay of 52 minutes due to a technical incident.
Delay· Minor disruption
Line C1. Train scheduled to depart at 15:50 from Murcia del Carmen station to Alacant Terminal is running via Elx-Parc, 18 minutes late. Infrastructure incident.
Delay· Minor disruption
Line C1. Train scheduled to depart at 15:50h from Alacant Terminal station to Murcia del Carmen is running through Elx-Parc with a 15-minute delay. Railway traffic management.
Delay· Minor disruption
Line C1. Train with scheduled departure at 15:30h from Callosa Segura station heading to Alacant Terminal is running through Elx-Parc 17 minutes late. Railway traffic management.
Delay· Minor disruption
Line C1. Train scheduled to depart at 15:00h from Alacant Terminal station bound for Callosa Segura departs 15 minutes late. Railway traffic management.
Delay· Minor disruption
Line C1. Train scheduled to depart at 14:10 from Murcia del Carmen station, bound for Alacant Terminal, is running via Crevillente 15 minutes late. Due to railway traffic management.
Delay· Minor disruption
Line C1. Train scheduled to depart at 14:10 from Alacant Terminal station for Murcia del Carmen is running through Elx-Parc with a 16-minute delay. Railway traffic management.
Delay· Minor disruption
Line C3. Train scheduled to depart at 16:28 from Sant Vicent Centre station to Alacant Terminal, departs from its origin with an approximate delay of 55 minutes due to an operational incident.
Delay· Minor disruption
Line C1. Train scheduled to depart from Alacant Terminal station at 13:20 bound for Callosa Segura is running via Crevillente 15 minutes late. Railway traffic management.
Delay· Minor disruption
Line C3. Train scheduled to depart from Alacant-Terminal station at 11:47h for Sant Vicent Centre, departs from its origin 29 minutes late. Railway traffic management.
Delay· Minor disruption
Line C1. Train due to depart at 10:35h from Callosa de Segura station to Alacant-Terminal is running via Torrellano 32 minutes late. Rail traffic management.
Delay· Minor disruption
Line C1. Train scheduled to depart from Callosa de Segura station at 10:35 for Alacant-Terminal is running via San Isidro-Albatera-Catral with a 16-minute delay. Railway traffic management.
Delay· Minor disruption
Line C3. Train scheduled to depart at 09:45 from San Vicent Centre station, bound for Alacant Terminal, departs from its origin 20 minutes late. Operational incident.
Delay· Minor disruption
Line C1. Train scheduled to depart at 07:30h from Alacant Terminal station for Murcia del Carmen is running 16 minutes late through Callosa Segura. Rail traffic management.
Delay· Minor disruption
Line C1. Train scheduled to depart at 06:45 from Murcia del Carmen station to Alacant-Terminal is running via Crevillente with a delay of approximately 16 minutes due to railway traffic management.
Delay· Minor disruption
Line C1. Train scheduled to depart at 6:30 from Alacant Terminal station bound for Murcia del Carmen is running through Elx-Parc 35 minutes late. Rail traffic management.
Attention: The partial strikes planned by the train drivers' union SEMAF for today, 12 November 2026, have been called off. Train service runs according to the usual timetable.
Due to the general strike called for 11 November, service could be affected. Thank you for your understanding.
How to read the figures
- On time
- Journeys arriving less than 5 minutes late.
- Higher is better
- Average delay
- Average minutes late across all measured journeys.
- Lower is better
- Cancelled
- Scheduled journeys that did not run.
- Lower is better